Nera Rapid Site Solution is a Turn-Key concept offering the fastest site construction available in the market today. This solution requires least man hours to erect the tower, least effort and least construction material, which makes it a perfect choice for ”quick time-to-market” projects.
The tower and the entire site construction are based on all-steel foundation, which is placed directly on the ground surface. The foundation bed includes a number of containers, each container containing ballast, and four soil anchors for highest tower load.
Ordinary site is a very resource-demanding and time-consuming solution. It may take more than 4 weeks to build a concrete foundation before the tower itself can be erected. More than 130 m³ shall be excavated, tons of sand, cement and water shall be trasported to the remote location. Additional concrete foundations for shelters, power station and fencing shall be built. The installation teams need to repeatedly visit sites to remove shuttering and maintain proper humidity levels for the concrete, all these leading to higher manpower costs and significant increase in project implementation time.
Rapid Site Solution eliminates all these time- and labour-consuming tasks. Combining state-of-the-art design and superior quality, it streamlines installation and maximises return on investment. It is the ultimate solution for network carriers challenged with the task of quick and cost-effective network rollout.
Benefits:
- The fastest site assembly in the market
- The highest tower without concrete foundations in the market
- All elements conform to international standards
- All elements manufactured by renowned vendors
- An economical solution
- The fastest way to generating network revenues